The construction of several buildings of our Nyíregyháza-based project is at such a stage that the electrical team, together with the BMS team, decided it would be worth taking a look at the work in progress. At IN-EX, the management is an absolute partner in giving young, budding engineers the opportunity to gain experience outside the office, as many of us have no prior background in construction. For us, a site visit like this is an opportunity to step outside the world of computer-assisted modelling by leaving Revit behind, and to see what we design on paper looks like in reality.

As mentioned above, our visit this time was mainly focused on all things electrical. We were joined by our experienced colleagues who are currently working on the project and who made our visit more interesting: they told us about the design phases, their experiences, interesting facts, difficulties and problems that had to be solved during the design process.

As regards their function, we were able to see the work being carried out in the buildings that will be used for packaging and storage in the future, and we were particularly interested in the distribution boards. Fortunately, we were able to catch a stage of construction in which there were distribution boards that were still heavily under assembly, but we also had the opportunity to see the Okken switchboards in trial operation. It was interesting to see both states, as in both cases we were able to study the boards from different angles.

Walking around the building, we were constantly amazed at everything we saw: the monumental halls, the air handlers being assembled, or even the size of a 4×240/120 cable, which is the largest size we usually design. The really curious ones were allowed to try to lift it up; I was one of them and I have to say, those assembling and working with them metre by metre have my greatest respect.

Physical reality of the 4x240/120 cable

At the end of the day, we had the chance to see a hall full of machines making plastic toys in operation. In this part of the building, in addition to the professional experience, we also had a little treat for our eyes, as we walked through the corridors and saw models of many collections, figures from a popular film or fairy tale, There was also a mock-up of the factory complex, built down to the smallest detail, which we lingered over and listened to our colleagues tell us stories about the design. In conclusion, we agreed that we would like to continue this tradition in the future and take the opportunity to visit projects under construction, where we can again expand our knowledge and become better professionals in this wonderful profession 🙂

Alexandra Takács, electrical engineer

Recent posts

2026.09.25.

From idea to impact

At IN-EX, we believe that our greatest asset is the knowledge, experience and curiosity of our people. The Innovation Hub was created to ensure that our engineers’ ideas do not remain isolated suggestions: we give them space, develop them together, and take initiatives that create real value all the way through to implementation.

2026.09.23.

Structural Challenges of an Automated Warehouse System and a BIM-Based Solution

Our project serves as a good example of how adapting existing industrial buildings to modern technologies can present a complex engineering challenge. The implementation of the automated high-bay warehouse system involved not only a technological  conversionbut also the adaptation of an existing reinforced concrete hall structure to new operational, structural, and fire safety requirements. 

2026.09.18.

New Technology, Existing Structure: A Steel Structural Solution for the Conversion of an Automated High-Bay Warehouse 

During the interior conversion of a high-bay warehouse attached to a manufacturing plant, it became necessary to install a state-of-the-art automated storage system. In the first phase of the project, we were commissioned to assess, at the conceptual design stage, whether the existing structural framework was suitable for accommodating the new technological system and to determine what structural modifications would be required to implement the conversion.

2026.09.08.

One Office, One Model: The Benefits of 3D Design and Multidisciplinary Collaboration

STUDIO IN-EX is a multidisciplinary design studio where almost every design discipline is represented under one roof. Every day, our colleagues experience the benefits of having designers from different disciplines work side by side, within a shared closed BIM environment and in the same office. What are these benefits in practice? We spoke to Lilla Vámos, one of our low-voltage systems designers, about her experience.

2026.09.03.

Case Study: Saving on Investment Costs Through Smart Warehouse Design

We believe that the investment cost of a project can be influenced to a significant extent during the design phase.  For this reason, our approach goes beyond simply meeting the applicable requirements. We also investigate alternative technical solutions that can provide the same level of technical performance and safety while resulting in lower investment costs. 

2026.08.05.

Model Checking Is Not About Finding Errors 

In model-based design, a BIM model is no longer just a 3D representation. A well-structured model contains geometry, information, and discipline-specific relationships in a single source of truth. It drives drawings, quantity take-offs, schedules, equipment lists, technical data deliverables, and serves as the common platform for multidisciplinary coordination.