Our departments at IN-EX – Project management

2022.11.08.

One of the strengths of IN-EX is that our design projects not only involve our highly professional engineers, but we also have a dedicated team that provides back-up support for the management of the projects. Our PM team is responsible for keeping projects on track and monitoring them. This specialized team, which is not common in design offices, can help our engineers to concentrate more on designing buildings more effectively and to have well-planned and monitored projects at the same time.

During the course of our all-round architectural design tasks, we have been confronted with the need to coordinate and to precisely organize the work of the disciplines involved in the design of a modern building, which is the key to successful, timely and efficient delivery. In the past, we have experienced several problems, extra time and costs, and especially a lot of stress due to the re-designs and the modifications, and the overtime caused by disorganized parallel design processes. The pressure, which was generated by the global economic processes have also encouraged us to improve our organizational culture in order to operate more efficiently. We have launched several internal organizational development projects, one of which was the training of design project managers and design managers, and the creation of a manual and a toolkit to support their work.

The IN-EX Project Management Manual is based on international literature, believing that having more than a decade of experience in project management cannot lead us astray. The Project Management Manual also covers the topic of risk management. In this context, our project managers participated in a risk management workshop today, where the problems and their appropriate solutions we face in our designing process were explained. After all, risk management is about managing problems and reducing the likelihood of them occurring before they happen.

At IN-EX, we place a strong emphasis on continuous improvement. The basic idea behind this is the fact that we continuously ask for feedback from our co-workers, when it comes to our designing projects. We do project evaluations on several occasions during each of our projects: we ask our co-workers for their feedback by sending them a standard questionnaire, because we need to know in which areas there is a potential to improve. During our project evaluations we receive useful feedback on development projects, for example on the design-related timing that is part of the Project Management Manual. „I believe the conscious internal scheduling made a great debut. In fact, none of the deadlines were endangered because we miscalculated the duration of the workflow. On the architectural side, we carried out a meticulous analysis. Almost no detail was overlooked and all the tasks had an owner and a specific deadline. “

Recent posts

2026.09.25.

From idea to impact

At IN-EX, we believe that our greatest asset is the knowledge, experience and curiosity of our people. The Innovation Hub was created to ensure that our engineers’ ideas do not remain isolated suggestions: we give them space, develop them together, and take initiatives that create real value all the way through to implementation.

2026.09.23.

Structural Challenges of an Automated Warehouse System and a BIM-Based Solution

Our project serves as a good example of how adapting existing industrial buildings to modern technologies can present a complex engineering challenge. The implementation of the automated high-bay warehouse system involved not only a technological  conversionbut also the adaptation of an existing reinforced concrete hall structure to new operational, structural, and fire safety requirements. 

2026.09.18.

New Technology, Existing Structure: A Steel Structural Solution for the Conversion of an Automated High-Bay Warehouse 

During the interior conversion of a high-bay warehouse attached to a manufacturing plant, it became necessary to install a state-of-the-art automated storage system. In the first phase of the project, we were commissioned to assess, at the conceptual design stage, whether the existing structural framework was suitable for accommodating the new technological system and to determine what structural modifications would be required to implement the conversion.

2026.09.08.

One Office, One Model: The Benefits of 3D Design and Multidisciplinary Collaboration

STUDIO IN-EX is a multidisciplinary design studio where almost every design discipline is represented under one roof. Every day, our colleagues experience the benefits of having designers from different disciplines work side by side, within a shared closed BIM environment and in the same office. What are these benefits in practice? We spoke to Lilla Vámos, one of our low-voltage systems designers, about her experience.

2026.09.03.

Case Study: Saving on Investment Costs Through Smart Warehouse Design

We believe that the investment cost of a project can be influenced to a significant extent during the design phase.  For this reason, our approach goes beyond simply meeting the applicable requirements. We also investigate alternative technical solutions that can provide the same level of technical performance and safety while resulting in lower investment costs. 

2026.08.05.

Model Checking Is Not About Finding Errors 

In model-based design, a BIM model is no longer just a 3D representation. A well-structured model contains geometry, information, and discipline-specific relationships in a single source of truth. It drives drawings, quantity take-offs, schedules, equipment lists, technical data deliverables, and serves as the common platform for multidisciplinary coordination.