Blog

More than 120 of our employees have earned a Revizto Academy certificate

2026.06.25.
At STUDIO IN-EX, we introduced Revizto to support our internal design review and BIM-based quality assurance processes. Based on our license portfolio, we are already among the larger Revizto user communities in the Hungarian market. However, for us, success is not measured by the number of users alone, but by how effectively the platform becomes embedded in our project delivery workflows.

120+ Certified Professionals: Building a Common Foundation for Better BIM Coordination.
We see the implementation of Revizto as much more than the adoption of a new software tool. It is part of a broader effort to continuously improve the way our projects are coordinated and delivered. To unlock the full value of a digital collaboration platform, teams need a shared knowledge base, a common way of working, and consistent application across projects.
That is why we are particularly proud to share that:
✅ More than 120 engineers and project coordinators have successfully earned the Revizto Academy Collaboration Core certification.
✅ Nearly 30 colleagues have already achieved the Coordination Pro certification.
🏆 Our entire BIM team has reached the highest level of certification, becoming Implementation Experts.
The Revizto Academy is a structured training and certification program designed to help users progressively develop their expertise:
  • Collaboration Core – covers the fundamentals of effective Revizto use, including 2D/3D navigation, issue management, and project collaboration.
  • Coordination Pro – focuses on advanced coordination workflows, permissions management, templates, and clash automation.
  • Implementation Expert – the highest certification level, covering implementation strategies, advanced automation, and the Revizto API.
For us, these certifications are not an end in themselves. Their real value lies in ensuring that our teams can rely on the same platform, the same foundational knowledge, and the same coordination mindset throughout their daily project work.
Thank you, and congratulations to all our colleagues for their dedication, commitment, and outstanding achievements. 👏

Recent posts

2026.09.25.

From idea to impact

At IN-EX, we believe that our greatest asset is the knowledge, experience and curiosity of our people. The Innovation Hub was created to ensure that our engineers’ ideas do not remain isolated suggestions: we give them space, develop them together, and take initiatives that create real value all the way through to implementation.

2026.09.23.

Structural Challenges of an Automated Warehouse System and a BIM-Based Solution

Our project serves as a good example of how adapting existing industrial buildings to modern technologies can present a complex engineering challenge. The implementation of the automated high-bay warehouse system involved not only a technological  conversionbut also the adaptation of an existing reinforced concrete hall structure to new operational, structural, and fire safety requirements. 

2026.09.18.

New Technology, Existing Structure: A Steel Structural Solution for the Conversion of an Automated High-Bay Warehouse 

During the interior conversion of a high-bay warehouse attached to a manufacturing plant, it became necessary to install a state-of-the-art automated storage system. In the first phase of the project, we were commissioned to assess, at the conceptual design stage, whether the existing structural framework was suitable for accommodating the new technological system and to determine what structural modifications would be required to implement the conversion.

2026.09.08.

One Office, One Model: The Benefits of 3D Design and Multidisciplinary Collaboration

STUDIO IN-EX is a multidisciplinary design studio where almost every design discipline is represented under one roof. Every day, our colleagues experience the benefits of having designers from different disciplines work side by side, within a shared closed BIM environment and in the same office. What are these benefits in practice? We spoke to Lilla Vámos, one of our low-voltage systems designers, about her experience.

2026.09.03.

Case Study: Saving on Investment Costs Through Smart Warehouse Design

We believe that the investment cost of a project can be influenced to a significant extent during the design phase.  For this reason, our approach goes beyond simply meeting the applicable requirements. We also investigate alternative technical solutions that can provide the same level of technical performance and safety while resulting in lower investment costs. 

2026.08.05.

Model Checking Is Not About Finding Errors 

In model-based design, a BIM model is no longer just a 3D representation. A well-structured model contains geometry, information, and discipline-specific relationships in a single source of truth. It drives drawings, quantity take-offs, schedules, equipment lists, technical data deliverables, and serves as the common platform for multidisciplinary coordination.